EDF Energy Renewables Ltd have submitted a connection application for their proposed 210MW Clash Gour Wind Farm development, which is located approximately 12km south of Forres in Moray, Scotland. SSEN Transmission will construct a new substation containing two 275/132kV transformers to facilitate the connection to the 275kV system. We have also proposed to erect two new 275kV towers close to the existing Knocknagael – Blackhillock 275kV double circuit tower line, to facilitate the installation of 275kV tapings. These structures will include down droppers connecting onto new 275kV switchgear located within the substation compound at the Clash Gour 275/132kV Substation. The aim of the project is to enable renewable energy to connect to our transmission network. For more information about our project please visit our project website by clicking here.
Portal Navigation
The information below is intended to assist with navigating the 3D Portal, however there is an Interactive Portal User Guide, which you can access by clicking here
The Map
In order to view the visualisations and navigate the portal, please start by clicking on any of the cameras on the adjacent map. They are situated next to their relevant viewpoints to allow access to areas of interest.
Should you prefer to view the map in satellite, this can be done by clicking the ‘Satellite’ tab at the top right hand corner of the map.
Once you have clicked on a viewpoint, if you want to return to the full map at any point, please click on the project map icon situated down the left-hand side of the map – it is a location pin icon on top of a grid.
If you are viewing a video and would like to return to the overview map, the project map icon is situated at the top right-hand corner of the screen.
Visualisations
Once you click on a visualisation, you will be presented with two tabs across the top middle of the screen; ‘Existing’ and ‘Potential’
If you click on the existing tab, it will show you the area as it currently stands, without the proposed Clash Gour Wind Farm Connection.
If you click on the proposed tab, it will show you the proposed Clash Gour Wind Farm Connection.